City of Victorville — Fire Prevention Division

Fee Schedule • 2025 Updates (CPI 3.34%)   Click Here to Download PDF Fee Sheet.

I. Construction Permits Plan Review & Inspection

Includes fire sprinkler systems (NFPA 13, 13R, 13D), fire pumps, private undergrounds, in‑rack sprinklers, pre‑engineered systems, fire alarm (new & modifications), aboveground storage tanks, building construction and tenant improvements, public water line reviews, and miscellaneous technical reviews.

Fire Sprinkler Systems — Commercial/Industrial (NFPA 13) — Modifications Per Riser
Plan Review & Inspection tiers by number of heads (per riser)
TierPhaseUnitFee
1–5 heads Plan Review per riser $159
6–19 heads Plan Review per riser $239
20–50 heads Plan Review per riser $319
51–100 heads Plan Review per riser $478
101–350 heads Plan Review per riser $638
>350 heads Plan Review per riser $1,275
1–5 heads Inspection per riser $478
6–19 heads Inspection per riser $638
20–50 heads Inspection per riser $956
51–100 heads Inspection per riser $1,164
101–350 heads Inspection per riser $1,594
>350 heads Inspection per riser $2,152
Fire Sprinkler Systems — Commercial/Industrial (NFPA 13) — New (First Riser per building)
First riser tiers; additional riser same hazard class
Tier / ItemPhaseUnitFee
1–20 heads (first riser) Plan Review first riser $638
21–50 heads (first riser) Plan Review first riser $956
51–100 heads (first riser) Plan Review first riser $1,275
101–350 heads (first riser) Plan Review first riser $1,913
Each additional riser (same hazard) Plan Review per riser $478
1–20 heads (first riser) Inspection first riser $638
21–50 heads (first riser) Inspection first riser $956
51–100 heads (first riser) Inspection first riser $1,164
101–350 heads (first riser) Inspection first riser $1,594
Each additional riser (same hazard) Inspection per riser $478
Commercial Fire Pump
Flat fees
PhaseUnitFee
Plan Review flat $956
Inspection flat $399
Single‑Family Residential — NFPA 13D Fire Sprinklers Plan Review & Inspection
Plan review tiers by area; inspection flat rates
Area / ItemPhaseUnitFee
Plan Review — 1–3,600 sq ft Plan Review flat $159
Plan Review — 3,601–5,000 sq ft Plan Review flat $239
Plan Review — >5,000 sq ft Plan Review flat $478
Plan Review — Tract Homes Plan Review flat $956
Inspection — 1–3,600 sq ft Inspection flat $112
Inspection — 3,601–5,000 sq ft Inspection flat $112
Inspection — >5,000 sq ft Inspection flat $112
Inspection — Tract Homes Inspection flat $74
Modifications to existing (per riser) Inspection per riser $37
Manufactured Home — factory sprinklers Inspection flat $37
Tank/well supply (bucket/pump test) Inspection flat $37
Multi‑Family Residential — NFPA 13R (per riser) Plan Review & Inspection
Plan review and inspection tiers
Tier / ItemPhaseUnitFee
Plan Review — 1–50 heads Plan Review per riser $478
Plan Review — 51–100 heads Plan Review per riser $638
Plan Review — >100 heads Plan Review per riser $797
Plan Review — Modification Plan Review flat $319
Inspection — 1–50 heads Inspection per riser $797
Inspection — 51–100 heads Inspection per riser $1,036
Inspection — >100 heads Inspection per riser $1,275
Inspection — Modification Inspection flat $717
Private Underground Fire Line Per System
Plan review and inspection tiers by number of risers/hydrants
TierPhaseUnitFee
1–10 risers/hydrants Plan Review per system $319
11–20 risers/hydrants Plan Review per system $478
>20 risers/hydrants Plan Review per system $638
1–10 risers/hydrants Inspection per system $877
11–20 risers/hydrants Inspection per system $1,275
>20 risers/hydrants Inspection per system $1,833
In‑Rack Sprinklers — Inspection Per Riser
Inspection tiers by head count
TierUnitFee
1–10 heads per riser $638
11–20 heads per riser $877
21–30 heads per riser $1,116
>30 heads per riser $1,435
Pre‑Engineered Systems / Equipment
Plan review flat and inspection per system
ItemPhaseUnitFee
General Plan Review Plan Review flat $638
Spray/Dipping/Powder coating booths Inspection flat $319
Industrial Ovens Inspection per system $319
Vapor Recovery Inspection per system $319
Refrigeration Inspection per system $319
Dust Collection Inspection per system $478
Hood & Duct Extinguishing Inspection per system $717
Gas System Inspection per system $478
Smoke Control System Inspection per system $478
Battery System Inspection per system $319
Special Extinguishing System Inspection per system $478
Commercial Solar Power Station Inspection flat $478
Commercial Structure‑Mounted PV Inspection flat $638
Emergency Responder Radio Coverage Inspection flat $319
Minor Modifications / Repairs Inspection flat $159
High‑Piled Combustible Storage (HPS)
Plan review & inspection tiers
ItemPhaseUnitFee
Plan Review Plan Review flat $638
Inspection — 500–10,000 sq ft Inspection flat $717
Inspection — 10,001–50,000 sq ft Inspection flat $1,196
Inspection — 50,001–100,000 sq ft Inspection flat $1,674
Inspection — each additional 100,000 sq ft Inspection per 100k sq ft $1,674
Hose Rack / Standpipe Systems — Inspection
Inspection tiers
TierUnitFee
1–5 racks/standpipes flat $638
6–10 racks/standpipes flat $956
Each additional over 10 per add’l $638
Fire Alarm — New System (Per System)
Waterflow monitoring & manual/automatic alarm tiers
ItemPhaseUnitFee
Waterflow Monitoring — Plan Review Plan Review flat $478
Manual/Automatic Fire Alarm — Plan Review Plan Review flat $638
Inspection — 1–10 initiating devices Inspection flat $717
Inspection — 11–50 initiating devices Inspection flat $797
Inspection — 51+ initiating devices Inspection flat $1,036
Fire Alarm — System Modifications (Per System) Plan review may be waived for minor mods
Plan review & inspection
ItemPhaseUnitFee
Plan Review Plan Review flat $638
Inspection — 10 initiating devices Inspection flat $638
Inspection — each additional 10 devices Inspection per add’l $797
Inspection — FACP upgrade Inspection flat $638

Plan review may be waived for minor modifications as determined by the department.

Aboveground Storage Tank
Plan review and inspection
ItemPhaseUnitFee
Plan Review Plan Review flat $638
Inspection — 1st tank Inspection flat $319
Inspection — each additional tank Inspection per add’l $80
Multi‑Family Residential Construction Projects
Plan review flat and inspection tiers
Area / ItemPhaseUnitFee
Plan Review Plan Review flat $638
Inspection — 1–10,000 sq ft Inspection flat $717
Inspection — 10,001–25,000 sq ft Inspection flat $956
Inspection — 25,001–50,000 sq ft Inspection flat $1,275
Inspection — >50,000 sq ft (each additional 1,000) Inspection per add’l $1,594
Commercial/Industrial New Construction Projects
Plan review & inspection tiers by area
Area / ItemPhaseUnitFee
Plan Review — 1–10,000 sq ft Plan Review flat $638
Plan Review — 10,001–50,000 sq ft Plan Review flat $797
Plan Review — 50,001–100,000 sq ft Plan Review flat $956
Plan Review — 100,001–500,000 sq ft Plan Review flat $1,116
Plan Review — 500,001–1,000,000 sq ft Plan Review flat $1,594
Plan Review — >1,000,000 sq ft (each additional 100,000) Plan Review per add’l $159
Inspection — 1–10,000 sq ft Inspection flat $638
Inspection — 10,001–50,000 sq ft Inspection flat $956
Inspection — 50,001–100,000 sq ft Inspection flat $1,275
Inspection — 100,001–500,000 sq ft Inspection flat $1,514
Inspection — 500,001–1,000,000 sq ft Inspection flat $2,551
Inspection — >1,000,000 sq ft (each additional 100,000) Inspection per add’l $1,196
Commercial Tenant Improvements
Plan review & inspection tiers
Area / ItemPhaseUnitFee
Plan Review — 1–10,000 sq ft Plan Review flat $319
Plan Review — 10,001–50,000 sq ft Plan Review flat $478
Plan Review — 50,001–100,000 sq ft Plan Review flat $638
Plan Review — >100,000 sq ft (each additional 10,000) Plan Review per add’l $159
Inspection — 1–10,000 sq ft Inspection flat $638
Inspection — 10,001–50,000 sq ft Inspection flat $956
Inspection — 50,001–100,000 sq ft Inspection flat $1,275
Inspection — >100,000 sq ft (each additional 10,000) Inspection per add’l $1,196
Water Improvement — Public Water Line (Plan Review)
Hydrant count tiers
TierUnitFee
First 1–10 hydrants flat $638
>10 hydrants — each additional 10 per add’l $1,036
Other Miscellaneous Development Review Fees Hourly / Actual Cost
Hazmat, technical analysis, alternate methods, medical gas, bulk beverage CO₂
ItemPhaseUnitFee
Hazardous Material Review — City Staff Review per hour $319
Hazardous Material Review — Consultant Review each Actual Cost
Technical Analysis / Opinion — City Staff Review per hour $319
Technical Analysis / Opinion — Consultant Review each Actual Cost
Alternate Materials & Methods — City Staff Review per hour $319
Alternate Materials & Methods — Consultant Review each Actual Cost
Medical Gas Systems — Plan Review Plan Review flat $638
Medical Gas Systems — Inspection Inspection flat $638
Bulk Beverage CO₂ — Plan Review Plan Review flat $638
Bulk Beverage CO₂ — Inspection (<10 devices) Inspection flat $319
Bulk Beverage CO₂ — Inspection (each additional 10) Inspection per add’l $319
Revision of previously approved plan / As‑Builts Flat$797
Plan re‑submittal (after 2nd) / Misc. plan check$319/hour

Where the original plan review fee is less than the revision fee, the original plan review fee shall be applied as the revision fee.

II. Annual Operational Permits

Base facility fee by size, plus per‑permit fees by hazard class (Low, Medium, High).

Base Permit Fee — Facility Size Flat by area
Facility area tiers
Facility SizeUnitFee
0–5,000 sq ft flat $399
5,001–10,000 sq ft flat $478
10,001–50,000 sq ft flat $638
50,001–100,000 sq ft flat $717
100,001–500,000 sq ft flat $797
500,000–1,000,000 sq ft flat $956
>1,000,000 sq ft flat $159

Total fee charged will be Base Fee + any applicable Annual Operating Permit(s).

Annual Operational Permit — per Permit Low • Medium • High Hazard$80 each
Representative permits (each $80)
Hazard ClassPermitUnitFee
Low Automobile Wrecking Yards flat $80
Low Cellulose Nitrate Film flat $80
Low Open Flames and Candles flat $80
Low Places of Assembly 50–299 flat $80
Medium Carbon Dioxide Enrichment Systems flat $80
Medium Carbon Dioxide Systems in Beverage Dispensing flat $80
Medium Combustible Fibers flat $80
Medium Dry Cleaning flat $80
Medium Fixed Hood & Duct Extinguishing Systems flat $80
Medium Industrial Ovens flat $80
Medium Liquid or Gas Fuel Equipment in Assembly Buildings flat $80
Medium Lumber Yards and Woodworking flat $80
Medium Miscellaneous Combustible Storage flat $80
Medium Motor Vehicle Fuel Dispensing flat $80
Medium Pyroxylin Plastics flat $80
Medium Places of Assembly 300–999 flat $80
Medium Production Facilities flat $80
Medium Refrigeration Equipment flat $80
Medium Rooftop Heliports flat $80
Medium Storage of Scrap Tires and Tire Byproducts flat $80
Medium Waste Handling flat $80
Medium Wood, Manure, and Organic Product Storage flat $80
High Aerosol Products flat $80
High Aviation Facilities flat $80
High Battery Systems flat $80
High Combustible Dust Producing Operations flat $80
High Compressed Gases flat $80
High Cryogenic Fluids flat $80
High Explosives flat $80
High Flammable and Combustible Liquids flat $80
High High‑piled Combustible Storage flat $80
High Hot Works Operations flat $80
High HPM Facilities flat $80
High Liquefied Petroleum Gases flat $80
High Magnesium flat $80
High Organic Coatings flat $80
High Pallet Yards flat $80
High Places of Assembly 1,000+ Occupants flat $80
High Plant Extraction Systems flat $80
High Repair Garages flat $80
High Spraying or Dipping flat $80
High Tire Rebuilding Plants flat $80
High Medical Gas Systems flat $80
Reinspection per inspection $80

III. Special Event / Temporary Use Permits

Counter permits, application review (minor/major), inspections (minor/major), fireworks displays, hourly inspection, and standby/cost recovery.

Miscellaneous Counter Permit (no inspection)$159
Application Review
Minor vs. Major application review
TypeUnitFee
Minor Special Event / Temporary Use flat $438
Major Special Event / Temporary Use / Film Permit flat $638
Minor Special Event / Temporary Uses — Inspection
Examples & tiers
EventUnitFee
Misc. Minor Event (up to 500 attendees) flat $359
Seasonal Sales Lot flat $239
Rocket Launching (high powered / experimental) flat $598
Haunted/Fun House/Maze flat $438
Bonfire flat $518
Tents, Canopies, Temporary Membrane Structures flat $359
Each additional structure flat $80
Major Special Event / Temporary Uses — Inspection Actual Cost

Major event inspections and film shoots with hazards are billed at actual cost; see Cost Recovery and Cal OES schedule.

Fireworks Public Display
Initial two hours and additional time
ItemUnitFee
First two hours first 2 hours $717
Each additional hour after two per hour $319
Inspection — each additional hour$319/hour
Cost Recovery During EventActual Cost
Special Event Standby Fees — Personnel billed per classification hourly rates; Equipment billed per Cal OES schedule (see Exhibit A).

IV. Mandated / Required Occupancy Inspections

State Fire Marshal regulated occupancies and other required inspections.

State Fire Marshal Regulated Occupancies Initial inspection up to 2 hrs unless noted
Selected occupancy inspection fees
Occupancy / ItemUnitFee
Day Care — Group E (7+ clients, no assistance) flat $239
Public/Private Schools — Group E flat $399
Health Care/Nursing/Detox — Group I‑2 flat $319
Detention Facility — Group I‑2 flat $159
Day Care (requiring assistance) — Group I‑4 flat $159
Multi‑Family Housing — Group R‑1/R‑2 (3 units) flat $319
Multi‑Family Housing — R‑1/R‑2 (4–15 units) flat $399
Multi‑Family Housing — R‑1/R‑2 (16–49 units) flat $478
Multi‑Family Housing — R‑1/R‑2 (50–99 units) flat $558
Multi‑Family Housing — R‑1/R‑2 (100–199 units) flat $717
Multi‑Family Housing — R‑1/R‑2 (200+ units) flat $638
Residential Care Facility — Group R‑2.1 flat $478
Residential Care Facility — R‑3.1 flat $478
Residential Care Facility — R‑4 flat $478
High‑Rise (initial inspection up to 2 hrs) up to 2 hrs $638
SFM Health Care/Detention/High‑Rise — each add’l hour after 2 per add’l hr $319
Other Required or Mandated Inspections$319/hour

V. Miscellaneous Fees

Administrative changes, duplication, payment plan, fiscal admin, returned check, civil subpoena fees.

Administrative Changes — Juvenile Firesetters Intervention ProgramActual Cost
Duplication fee (with certification stamp) — per page per City Clerk Fee Schedule; same for general duplication fee.
Payment Plan$319Fiscal Administrative FeeActual cost
Returned Check Fee — First: $25; Subsequent: $35
Civil Subpoena Fees — Record subpoena (research/prep): $319/hour; Witness fee: set by State.

VI. Cost Recovery

Hourly staff rates, equipment rates, false/nuisance alarms, incident‑related fees, and case‑by‑case services.

Hourly Rates — Prevention: $319/hour; Suppression/Operations: Actual Cost per Cal OES.
Equipment RatesCal OES schedule (see Exhibit A).
Administrative Penalties — False or Nuisance Fire Alarms — First & Second response: No Charge; Third+ responses: $478.
Other Incident‑Related FeesActual Cost
Unlisted Services — Case‑by‑case using fully burdened hourly staff labor rate × staff time: $319/hour.

Notes & References

  • Total fee charged will be Base Facility Fee + applicable Annual Operating Permit(s).
  • Costs/fees for other department review may apply separately.
  • Witness fees regulated by California Code of Regulations, Title 8, §382.
  • Hourly rates per CAL OES schedule (see Exhibit A).
  • False/Nuisance Alarm penalties per Ordinance 2266 §3.5 (1‑18‑2011) — fees, not fines.
  • Plan review may be waived for minor alarm modifications as determined by the department.
  • Where original plan review fee is less than revision fee, original fee is applied to revision.
City of Victorville • Fire Prevention Division • 14345 Civic Center Drive, Victorville, CA 92392 • (760) 955‑5233